Fill 3000 PSI and 4500 PSI paintball makers tanks

29 September, 2008 |

Fill 3000 PSI and 4500 PSI paintball makers tanks safely with the same compressor using BAUER's Change-Over Device. Available as an optional accessory on JRII/PB and Oceanus/PB compressors.

UPDATE: GIT Seminars

16 September, 2008 |

BAUER Plastics Technology Group is pleased to announce the scheduling of our next gas assist seminar!

WHEN: October 16, 2008
WHERE: George Fischer Sloane
7777 Sloane Drive
Little Rock, AR 72206

The seminar is being presented by the Arkansas chapter of the Society of Plastics Engineers; you can view directions to the seminar's location by clicking here.

More information regarding this event will be posted in this space soon, so be sure to check back for additional updates!

NPE 2009

20 June, 2008 |

McCormick Place, Chicago

BAUER Plastics Technology Group is pleased to announce our participation in the 26th edition of NPE, the International Plastics Showcase. The next installment of NPE will take place from June 22-26, 2009.

Check this space in the coming weeks and months for updates on our plans for NPE 2009.

Come and visit us in the North Hall, Booth 62128!!

Official NPE 2009 website

COMING SOON: GIT Seminars

28 February, 2008 |

In the coming weeks and months, we will be making official announcements regarding the scheduling of regional gas assist injection molding seminars in a number of cities. These seminars will be geared towards demonstrating the many benefits gas assist can bring to your conventional injection molding process. Expect the sessions to be informative for molders and processors of all skill levels, from the veteran gas assist processor to those who may never have heard of the technology.

BREAKING NEWS: Cinpres v. Melea Judgment

28 February, 2008 |

Recently, the England and Wales Court of Appeal has presided over the appeal of Cinpres Gas Injection, with regard to their long-running legal battles with Gain Technologies (aka Melea Limited). The details of the decision handed down by the High Court of Justice Chancery Division in September 2006, which ruled in favor of Melea, can be found by clicking here.

Cinpres v. Melea Judgement -- Sept. 2006

09 November, 2006 |

There are new developments in the ongoing legal battles between Cinpres Gas Injection and Gain Technologies (aka Melea Limited). A judgement was issued dated 10 September 2006 regarding this latest round of litigation between the two gas assist competitors.

Here is the final ruling from the presiding judge in this case:

BAUER Welcomes New Southeast Rep Group

03 November, 2006 |

BAUER Plastics Technology Group, a division of BAUER Compressors, Inc, Norfolk, VA, is pleased to announce our collaboration with Southeastern Polymer Solutions. They will be responsible for representing BAUER gas assist technology and services in North Carolina, South Carolina, Tennessee, Alabama, & Georgia, and count Conair and Xaloy among their variety of product lines. BAUER Sales Network

Click here for more information regarding Southeast Polymer Solutions.

BAUER Welcomes New Canadian Rep Group

03 November, 2006 |

BAUER Plastics Technology Group, a division of BAUER Compressors, Inc, Norfolk, VA, is pleased to announce our collaboration with Control Solutions, Inc. They will be responsible for representing BAUER gas assist technology and services in the Canadian provinces of Ontario and Quebec. BAUER Sales Network

Please join us in welcoming Control Solutions to the BAUER family!

BAUER Welcomes Steven VanHoeck

03 November, 2006 |

BAUER Plastics Technology Group, a division of BAUER Compressors, Inc, Norfolk, VA, is pleased to announce our collaboration with Steven VanHoeck. Mr. VanHoeck's activities are integrated with BAUER's Plastics Technology Group to support customers with part and tooling development and gas assist processing utilizing BAUER systems and technology.

Maxi Verticus

05 May, 2005 |

5000/6000 PSIG - FOUR AND FIVE STAGE DESIGNS

If your need is for greater air requirements, MAXI VERTICUS provides capacity ranges from 19.0 to 42.0 SCFM charging rate with discharge pressures up to 6000 PSIG. The vertical cabinet design combines compressor, SECURUS® Electronic Moisture Monitoring System in a sound attenuated vertical enclosure designed for diminishing operating sound level to less than 79 dBA.